John Paul College – Gym Flooring & Seating Works
Demolition of the existing seating, preparation of the floor base for the installation of new timber flooring, including line marking, installation of thresholds, new aluminium double doors, and carpet installation.
St Anne’s Primary School – Refurbishment & Extension of Learning Building
Refurbishment and extension of the existing Senior Block to create a modern learning facility comprising six classrooms and associated ancillary spaces, along with associated external works and landscaping.
St John the Baptist Primary School – New Learning Centre
Full demolition of part of the existing building to create an expanded, enhanced landscaped area for students, followed by partial demolition, rebuilding, extension, and complete refurbishment.
St Peters College – LEC & Student Services Refurbishment
Conversion of the existing staff building into teaching spaces, including full services upgrades, structural works, and new walls, ceilings, and floor finishes.
St Brendan’s Primary School – MP Stage One
Refurbishment of the external landscaped courtyard, including playground design, and internal spaces. Demolition of the existing toilet block to form new toilet facilities.
Red Hill Pavilion – Upgrade
Refurbishment of existing changing rooms and wet areas, complemented by a building extension to house new amenities and upgrades to the existing commercial septic system.
Santa Maria College – Expansion & Refubishment
Extensive refurbishment and expansion of Santa Maria College’s chapel, alongside extensive landscaping. This project required a precise approach to minimise disruptions in a live school environment. Careful planning included weekly communication, designated access routes, and scheduling of noisy tasks outside of school hours and exam times. Hazardous materials were safely removed on weekends, ensuring a smooth, safe project with minimal impact on students and staff.
KU Monash Childrens Centre and Kindergarten – Refurbishment
Necessary rectifications to non-compliant issues, complemented by a comprehensive refurbishment throughout including shared spaces, multiple teaching spaces, a kitchen upgrade and mechanical ventilation upgrade.
Monash Medical Centre – Refurbishment
Refurbishment to the existing boardroom to create a smaller boardroom, office and adjoining breakout space.
Nazareth College – Refurbishment
Specialised improvements to the existing building and educational spaces, featuring the installation of a lift. Extensive refurbishment to the food technology room, student-use commercial kitchen, and STEM facility.
Elonera Kinder – Modular Facility Expansion
Kinder Expansion Consisting of In Ground Civil Works, Modular Sub Floor Crane Lift And New Build of Entire Building Block.
St Thomas More PS – Prep Classrooms Refurbishment
Refurbishment Of Prep Building Consisting of Internal Asbestos Removal, Full Internal Fit out, External Cladding Rectification and Fire Shutter Installation.
St Louis De Montfort PS – Admin Upgrade
Refurbishment Of Administration Building Including New External Façade Design & Landscaping
Monash RadioChem Lab
Radiation Chemical Laboratory Fit out Inclusive of Radiation Monitoring System Installation And Fume Hood Extraction System
St Joseph’s Primary School, Admin Building
Refurbishment of school admin building including external concreting and decking.
St Anthony’s Primary School, Admin Building
Internal refurbishment of admin building incl new joinery, windows and furniture.
Peninsula Private Hospital, Substation & Infrastructure
Substation construction & infrastructure upgrade to facilitate future mechanical AC upgrades.
Mitcham PH – Windsor Ward Extension, Mitcham
Refurbishment of 7 patient rooms, common area and corridor
Monash University – Courtyard , Clayton
Landscaping & Civil project including furniture, extensive planting and drainage alterations
Frankston Private Hospital, South East Melbourne
Frankston Private Hospital required existing consulting rooms to be completely renovated and refreshed. The rooms were in such a run-down state and could no longer be used due to the uninhabitable environment.
Peninsula Private Hospital, South East Melbourne
The existing air conditioning system at Peninsula Private Hospital was installed upon construction over 20 years ago. Due to its age, the system started showing evidence of rust, water leaks and overall lack of functionality.
Changing Places DDA Bathroom, Brighton
Construction of 'Changing Places' spec DDA toilet block incl all compliant equipment & associated supporting civil/services upgrade works
Watsonia Podiatry, North Melbourne
The Watsonia Podiatry team wanted to achieve a contemporary and clean clinic atmosphere that would serve them now and well into the future enabling business growth.
Manningham General Practice, North East Melbourne
When Manningham General Practice discovered part of its exterior building contained illegal combustible cladding on the exterior, they urgently wanted it removed. In order to meet compliant standards, they required the façade to be replaced with new cladding.